Degnan’s scope included constructing the substation from the suspended concrete slab upwards, ensuring a robust and functional structure. The building was completed with architectural finishes such as glazed brickwork, louvres, composite cladding, and detailed internal fit-outs, including joinery and kitchen installations.
On-site parking areas, roads and landscaping were also constructed on the site. Meticulous planning and collaboration was required as the substation was constructed adjacent to the rail corridor and work areas were restricted.