The new look accessible Towradgi Station is expected to be completed in late 2022*
Key features include:
A new footbridge over the rail corridor connecting the platforms of Towradgi Station
Two new lifts which will have three stops including platform level, road/pedestrian level and footbridge level. Lift landings will also have weather protection canopies at the waiting areas
New footpaths to connect Towradgi Road and Weber Crescent to the station and the new footbridge, as well as footpaths to the new accessible car spaces and kiss and ride area
Two accessible parking spaces and a kiss and ride zone on Weber Crescent
New stairs on either side of the footbridge
New family accessible toilet to replace existing toilet
Replacement of platform shelters
Minor regrading and widening of the station platforms
Upgrades to closed circuit television (CCTV), lighting, handrails, drainage works, landscaping, wayfinding and signage
Construction of a new station services equipment room